On the night of July 20–21, 2025, we successfully carried out the transport of a section of a railway bridge as part of the modernization of the Smíchov railway junction. The convoy, with a total weight of 310 tons and a length of 59 meters, was moved from Horní Počernice via the South Connecting Road to Smíchov, assisted by the Czech Police. Due to the load dimensions and traffic safety, temporary traffic restrictions were implemented, including intersection closures and guardrail removals.